AnalyticWD is your engine math support.
You are the process owner — we only help you take the best decision.
5 calibrated physical engines for completion design: Hammerlindl 1977, Lubinski 1962, Mitchell, Burkhardt 1961 and Ramey. Field-calibrated against real WCS data. ISO 31000 risk-aware, API RP 14B compliant, GitHub audited.
The Physics
Each engine implements a peer-reviewed physical model and runs in the browser with full input traceability. Calibrated against real WCS field data from HP/HT wells. Engine math is exact — field deviations reflect operator-applied tension and slack-off, transparently captured and auditable.
Doctrine · AnalyticWD Philosophy
AnalyticWD never makes the decision. AnalyticWD calculates with full traceability so the licensed engineer can decide with confidence. Field-applied tension, slack-off magnitude, set-pressure — all human decisions, transparently captured. Decision-support, never decision-maker.
Risk-Aware by Design
Packer failures, tubing collapse and H₂S events are the silent killers of completion economics. Physics-linked regulatory risk engine: every run raises its own risks from the calculated results (surge, torque, collapse, ECD, H₂S…), validates the engineering lever that brings each one down, and ties it to the standard (IOGP 510 · NORSOK Z-013 · ISO 31000 · NACE MR0175).
Safety alerts are included in every run; the full analysis — 5×5 matrices, levers and residual risk, cross-cutting audit and forensic seal, ready for your client or regulator — is an add-on. Company-wide risk management, standards & human factor: AWD HSE →
Get Started
Well Completions Pro and Liner Hanger are in their release process: we are adding packer setting by packer type. Leave your details and we will contact you when they are released.